Categories
Design Tips

Why You Should Book Now To Get Your Dream Yard in 2024

Did you know that now is actually the perfect time to get started if you want to enjoy your new yard next year? 🤔

Here’s why:

️1️⃣ Permitting & construction takes time, so the sooner you start, the better!

2️⃣ It’s the slow season for contractors, so you can often get a great deal and maximize your budget when you book now.

3️⃣ Your yard will be top priority, so you can actually enjoy your yard in 2024 instead of waiting for construction to be complete.

Keep scrolling for a look at our typical client’s timeline.

And, click the button below to book your free design consultation if you want 2024 to be the year you finally get your dream yard.

Categories
Design Inspo

Can You Make My Yard Timeless And Elegant?

Can You Make My Yard Timeless And Elegant?

We only need two words to describe this outdoor space:

Timeless elegance. 


It’s reminiscent of Roman times with… 
 

→  A moon-shaped pool 

→  Bold black and white accents 

→  Regal details
 

Keep scrolling to see how we took our client’s blank backyard and transformed it into an award-worthy private resort.  

But, you don’t have to be into a classic design style like this to get the yard you’ve always wanted.

We design in your preferred style and make sure the aesthetic of your new space is exactly what you envisioned for your backyard makeover. Click the button below to get started. 

PS: Now’s a really good time to reach out. It often takes longer than you think for permitting and construction, so if you want your new yard in 2024, book your design consultation call ASAP.

get all the details

Take A Virtual Tour Of This Yard

This entrance is unforgettable — with a fountain and a grand gate that instantly makes you feel like you’re entering an exclusive resort. It’s 5-star elegance at its finest and we’re so excited to share it with you. 

Categories
Design Inspo

Exclusive Design Preview: Your First Look At Our Latest Yards

We’re giving you an exclusive first look at our latest designs.

We can’t wait for construction to be complete, so here’s a preview of them now to inspire your backyard makeover.

If you’re ready to get started, just click the button below to schedule your free design consultation.

Or, if you’re not quite ready to commit to your project yet, keep scrolling for some serious exterior inspiration.

Our clients loved working with their architects to build their dream home – and reached out to us for their exterior design. You deserve an outdoor space you love as much as the interior of your home, and this design is proof that it’s possible.

This transitional design is opulence at its finest. Our client wanted ‘wow’ and that’s exactly what we gave them in this massive, $1,000,000+ design. We transformed this backyard into a private resort with water features, floating walkways, and more.

This dreamy, monochromatic space is the ultimate backyard spa. We added layers, levels, and a ton of texture so our clients can escape in this space and feel like they’re on vacation every time they step outside.

ON YOUTUBE:

5 ‘Wow Factor’ Features In This $600,000 Backyard Makeover

READY TO TRANSFORM YOUR YARD? 

Here’s How To Get Started:

Ready To Transform Your yard?

Download The Ultimate Exterior Design Inspiration Guide

Enter your name and email below to get instant access to an exclusive look at our latest designs, the stand-out features that bring each yard to life, and tons of inspiration for your own backyard transformation.

Categories
Design Inspo

Before & After: 5-Star Design For A Mid-Century Modern Home In Colorado

This angular yard had a ton of unusable space before, but our design completely transformed the Mid-Century Modern home into an insane outdoor space our clients can actually enjoy.  
 
It’s part spa, part dinner party venue, part outdoor movie theater—and manages to include everything on our client’s wish list and more.  

Plus, this outdoor space is proof that you can have a luxury yard when you live in a colder climate.

Imagine how relaxing it would be to soak in this spa with that view of the mountains.  

Keep scrolling to see all the details and tour this yard on YouTube.  

Ready to transform your yard? Click the button below to get started. 

ON YOUTUBE:

5 ‘Wow Factor’ Features In This $600,000 Backyard Makeover

READY TO TRANSFORM YOUR YARD? 

Here’s How To Get Started:

Ready To Transform Your yard?

Download The Ultimate Exterior Design Inspiration Guide

Enter your name and email below to get instant access to an exclusive look at our latest designs, the stand-out features that bring each yard to life, and tons of inspiration for your own backyard transformation.

Categories
Design Tips

Why You Need An Exterior Designer

If you want a gorgeous kitchen – 

✔︎  Something that will fit all your needs  
✔︎  Meshes with your home’s interior and your design style 
✔︎  You’ll actually enjoy using because it’s functional and stunning 

Which makes more sense?   

Hiring a cabinet maker to design your dream kitchen. 

 Or… 

Working with an interior designer

 🤔 

 The answer is pretty simple, right?  

You’d work with an interior designer

Sure, a cabinet maker has worked on a ton of kitchens and could probably come up with something based on all the designs he or she has built and installed. 

But, if you want creativity and expertise, you’d hire a designer.  

Just like you would… 

❌  Not hire a tile installer to design your dream spa-feel bathroom or hire a painter to design your ultra-relaxing, hotel-inspired bedroom. 

✅ You’d hire an interior designer

👉  When it comes to the exterior of your home, and your yard, the same is true. You would… 

❌  Not hire a contractor or a pool installer to design your dream yard. 

✅ You’d hire an exterior designer. 

And that’s exactly why Foxterra Design focuses on luxury exterior and pool design.   

We create custom designs for our clients – backed by our design expertise and our experience working as contractors.

It’s the best of both worlds because you end up with a world-class design that’s everything you wanted for your yard. 

And, you know that a contractor will actually be able to build the design in real life.  

If you want your yard to… 

✨  Fit your design style and seamlessly blend indoor/outdoor living 

✨  Have that ‘wow’ factor that will make your yard stand out 

✨  Include stunning features and high-end details only an experienced exterior designer would think of 

then click the button below to book your free Design Consultation with our team of expert exterior designers. We can’t wait to start exploring the potential in your yard.  

ON YOUTUBE:

5 ‘Wow Factor’ Features In This $600,000 Backyard Makeover

READY TO TRANSFORM YOUR YARD? 

Here’s How To Get Started:

Ready To Transform Your yard?

Download The Ultimate Exterior Design Inspiration Guide

Enter your name and email below to get instant access to an exclusive look at our latest designs, the stand-out features that bring each yard to life, and tons of inspiration for your own backyard transformation.